Você está no menu de acessibilidade

Utilize este identificador para citar ou criar um link para este item: http://acervodigital.unesp.br/handle/11449/35279
Título: 
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
Autor(es): 
Instituição: 
  • Univ W England
  • Universidade Estadual Paulista (UNESP)
  • Universidade de São Paulo (USP)
ISSN: 
1381-1231
Resumo: 
A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking into account sequence-dependent setup costs and times, and then adapted for rolling horizon use. A relax-and-fix (RF) solution heuristic is proposed and computationally tested against a high-performance MIP solver. Three variants of local search are also developed to improve the RF method and tested. Finally the solutions are compared with those currently practiced at the foundry.
Data de publicação: 
1-Ago-2007
Citação: 
Journal of Heuristics. Dordrecht: Springer, v. 13, n. 4, p. 337-358, 2007.
Duração: 
337-358
Publicador: 
Springer
Palavras-chaves: 
  • lot-sizing
  • scheduling
  • sequence-dependent setup costs and times
  • fix-and-relax
  • local search
Fonte: 
http://dx.doi.org/10.1007/s10732-007-9011-9
Endereço permanente: 
Direitos de acesso: 
Acesso restrito
Tipo: 
outro
Fonte completa:
http://repositorio.unesp.br/handle/11449/35279
Aparece nas coleções:Artigos, TCCs, Teses e Dissertações da Unesp

Não há nenhum arquivo associado com este item.
 

Itens do Acervo digital da UNESP são protegidos por direitos autorais reservados a menos que seja expresso o contrário.