Utilize este identificador para citar ou criar um link para este item:
http://acervodigital.unesp.br/handle/11449/35279- Título:
- Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
- Univ W England
- Universidade Estadual Paulista (UNESP)
- Universidade de São Paulo (USP)
- 1381-1231
- A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking into account sequence-dependent setup costs and times, and then adapted for rolling horizon use. A relax-and-fix (RF) solution heuristic is proposed and computationally tested against a high-performance MIP solver. Three variants of local search are also developed to improve the RF method and tested. Finally the solutions are compared with those currently practiced at the foundry.
- 1-Ago-2007
- Journal of Heuristics. Dordrecht: Springer, v. 13, n. 4, p. 337-358, 2007.
- 337-358
- Springer
- lot-sizing
- scheduling
- sequence-dependent setup costs and times
- fix-and-relax
- local search
- http://dx.doi.org/10.1007/s10732-007-9011-9
- Acesso restrito
- outro
- http://repositorio.unesp.br/handle/11449/35279
Não há nenhum arquivo associado com este item.
Itens do Acervo digital da UNESP são protegidos por direitos autorais reservados a menos que seja expresso o contrário.
