Please use this identifier to cite or link to this item:
http://acervodigital.unesp.br/handle/11449/113620
- Title:
- Multistage Transmission Expansion Planning Considering Fixed Series Compensation Allocation
- Universidade Estadual Paulista (UNESP)
- Univ Florida
- Univ Antioquia
- Interconex Elect SA ISA
- 0885-8950
- Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
- Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
- Interconexion Electrica S.A.-ISA
- FAPESP: 11/20465-2
- This paper proposes a mathematical model for multistage transmission expansion planning (TEP) considering fixed series compensation (FSC) allocation and N-1 security constraints for both transmission lines and FSCs. FSCs can increase the transmission lines transfer capacity, but the importance of using them in TEP is to dispatch the power more efficiently, resulting in a different topology with less investment cost compared with planning without FSCs. This problem is modeled as a linear mixed binary programming problem and is solved by a commercial branch-and-cut solver to obtain the optimum solution. FSC is modeled as a fixed impedance located in the transmission lines in discrete steps and with an investment cost based on the prices of reinforcement lines. The results obtained using two known test systems show the economic benefits of using FSC in multistage TEP problems.
- 1-Nov-2013
- Ieee Transactions On Power Systems. Piscataway: Ieee-inst Electrical Electronics Engineers Inc, v. 28, n. 4, p. 3795-3805, 2013.
- 3795-3805
- Institute of Electrical and Electronics Engineers (IEEE)
- Fixed series compensation allocation
- linear mixed binary programming problem
- multistage transmission expansion planning
- security constraints
- http://dx.doi.org/10.1109/TPWRS.2013.2266346
- Acesso restrito
- outro
- http://repositorio.unesp.br/handle/11449/113620
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.