Please use this identifier to cite or link to this item:
http://acervodigital.unesp.br/handle/11449/113624
- Title:
- Optimal Reactive Power Planning Using Risk Analysis
- Universidade Estadual Paulista (UNESP)
- 1944-9925
- In this paper, the optimal reactive power planning problem under risk is presented. The classical mixed-integer nonlinear model for reactive power planning is expanded into two stage stochastic model considering risk. This new model considers uncertainty on the demand load. The risk is quantified by a factor introduced into the objective function and is identified as the variance of the random variables. Finally numerical results illustrate the performance of the proposed model, that is applied to IEEE 30-bus test system to determine optimal amount and location for reactive power expansion.
- 1-Jan-2013
- 2013 IEEE Power and Energy Society General Meeting (pes). New York: IEEE, 5 p., 2013.
- 5
- Ieee
- Mean-variance
- reactive power planning
- stochastic programming
- two - stage
- uncertainty
- http://dx.doi.org/10.1109/PESMG.2013.6672114
- Acesso restrito
- outro
- http://repositorio.unesp.br/handle/11449/113624
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.