Please use this identifier to cite or link to this item:
http://acervodigital.unesp.br/handle/11449/142471
- Title:
- Dimensionamento de sistema de geração fotovoltáica grid-tie e instalação de planta de 3 kWp na usina ecoelétrica
- Universidade Estadual Paulista (UNESP)
- 2176-9761
- Pró-Reitoria de Extensão Universitária (PROEX UNESP)
- This paper presents the main topics of design and general sizing of photovoltaic generation systems connected to the power grid. A real case study of installing a complete system of 3 kWp on Renewable Energy Laboratory of Unesp Ilha Solteira is displayed. The system is in working more than two months without interruption, generating more than 1 MWh and has served the undergraduate teaching and extension as the electrical engineering week and other general outreach activities of the University.
- Neste trabalho são apresentados os principais tópicos de projeto e dimensionamento geral de sistemas de geração fotovoltaico conectados a rede de energia. É apresentado um estudo de caso real da instalação de um sistema completo de 3 kWp no Laboratório de Energias Renováveis da Unesp Ilha Solteira. O sistema encontra-se funcionando a mais de tres meses ininterruptamente, gerando mais de 1 MWh e tem servido as atividades de ensino de graduação e extensão como na Semana de Engenharia Elétrica e outras atividades de divulgação geral do Universidade.
- 2-Sep-2015
- 8º Congresso de extensão universitária da UNESP, p. 1-8, 2015.
- 1-8
- Universidade Estadual Paulista (UNESP)
- Smart grid
- Renovable energy
- Photovoltaic generation grid-tie
- Redes inteligentes
- Energia renovável
- Geração fotovoltaica grid-tie
- http://200.145.6.205/index.php/congressoextensao/8congressoextensao/paper/view/1131
- Acesso aberto
- outro
- http://repositorio.unesp.br/handle/11449/142471
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.