You are in the accessibility menu

Please use this identifier to cite or link to this item: http://acervodigital.unesp.br/handle/11449/143888
Title: 
O método gain scheduling no controle da pressão na perfuração de poços de petróleo
Other Titles: 
The gain scheduling method in the pressure control in the oil wells drilling
Author(s): 
Silva, Carlos Alexis Alvarado
Institution: 
Universidade Estadual Paulista (UNESP)
Sponsorship: 
Agencia Nacional de Petróleo (ANP)
Sponsorship Process Number: 
PRH48/ANP: 48610.009725/2013
Abstract: 
  • Controlar a pressão de poços petrolíferos durante a perfuração pode ser um dos processos mais complexos e perigosos da etapa de exploração. O sistema de perfuração varia constantemente e aleatoriamente, isto principalmente, devido à mudança da profundidade de perfuração, a qual faz variar outros parâmetros do processo. Assim, a aplicação de um controle variante no tempo torna-se necessário. Este estudo propõe o projeto de um controlador Gain Scheduling (GS) no controle da pressão no fundo de poços durante a perfuração. Este controlador GS consiste na sintonia dos ganhos relacionados aos diferentes pontos operacionais, para este caso, a profundidade do poço. Primeiro, apresentam-se as teorias a serem utilizadas durante o desenvolvimento do trabalho. Segundo, obtém-se o modelo matemático do processo o qual se fundamenta na mecânica dos fluidos. Da linearização do modelo, a função de transferência resultante apresenta um elemento integrador o que faz que a dinâmica do processo seja difícil de manipular. Também se adiciona um tempo de atraso, o que torna mais complexo o controle do processo. Na terceira parte, utilizaram-se três tipos de metodologias IMC (Internal Model Control) para sintonizar os ganhos do controlador PID (Proporcional, Integral e Derivativo) para diferentes profundidades de perfuração procurando o melhor desempenho, estabilidade e robustez do sistema. Finalmente, escolhe-se a estratégia de melhor desempenho (IMC de dois graus de liberdade) para especificar e montar a tabela do controlador GS, o qual é avaliado mediante simulações de problemas que geralmente ocorrem durante a perfuração, considerados como distúrbios, que verificam a sua viabilidade. Também, os resultados do sistema controlado por GS são comparados com os resultados de um outro controlador do tipo adaptativo de modelo de referência (CAMR). Verificando também melhor desempenho o controlador GS diante do CAMR.
  • Controlling the pressure of oil wells during drilling can be one of the most complex and dangerous processes of exploration stage. The drilling system is constantly end randomly changing due, among other things, the drilling depth, which varies other process parameters, accordingly to apply a time variant control becomes necessary. This study proposes the design of a Gain Scheduling controller to control the pressure at the bottom of wells during drilling. The GS controller is based on the corresponding tuning gains at different operating points in this case, the depth. First, presents the theories that will be used during development work. In the second part, was obtained a mathematical model of the process which is based on fluid mechanics. In the linearization of the, the final transfer function presents an integrating element which makes the process dynamics more difficult to handle. It becomes even more complex in the presence of time delay. In the third part, three IMC controllers’ types were used to tuning the PID (Proportional, Integral and Derivative) controller gains for different depths of drilling looking for the best performance, stability and robustness. Finally, was chose the best performing strategy (IMC of two degrees of freedom) to specify and assemble the GS controller table, which is evaluated by simulations of problems that usually occur during drilling, considered as disturbances, which check its viability. Also, the results of the controlled GS system are compared with the results of another adaptive controller model of model reference (MRAC). Also verifying that the GS controller presents better performance than MRAC.
Issue Date: 
4-Jul-2016
Publisher: 
Universidade Estadual Paulista (UNESP)
Keywords: 
  • Gerenciamento da pressão de perfuração
  • Perfuração de poços
  • Controle da pressão em poços petrolíferos
  • Controlador IMC
  • Controlador Gain Scheduling
  • Manage Pressure Drilling
  • Wells drilling
  • Control of oil wells pressure
  • IMC controller
  • Gain Scheduling controller
URI: 
Access Rights: 
Acesso aberto
Type: 
outro
Source:
http://repositorio.unesp.br/handle/11449/143888
Appears in Collections:Artigos, TCCs, Teses e Dissertações da Unesp

There are no files associated with this item.
 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.