You are in the accessibility menu

Please use this identifier to cite or link to this item: http://acervodigital.unesp.br/handle/11449/9852
Title: 
Primary power distribution systems planning taking into account reliability, operation and expansion costs
Author(s): 
Institution: 
  • Universidade Estadual Paulista (UNESP)
  • IFG Fed Inst Technol
ISSN: 
1751-8687
Sponsorship: 
  • Rede Energia electric utilities from São Paulo Brazil
  • Fundação de Ensino Pesquisa e Extensão de Ilha Solteira (FEPISA)
  • Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
  • Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Sponsorship Process Number: 
  • CNPq: 302272/2009-7
  • FAPESP: 09/15925-4
  • FAPESP: 09/53841-7
Abstract: 
In this work, the planning problem of primary distribution networks is formulated as a multi-objective mixed-integer non-linear programming model (MINLP). The objective functions of this model are the expansion and operation investment costs of primary distribution networks as well as the system's reliability costs in the contingency events. The reliability costs are obtained by means of calculating the non-supplied energy because of the repairing and switching operations in the distribution network carried out to isolate and to redistribute loads in the affected sections by permanent faults. In order to solve the expansion problem of the primary network a Multi-objective Reactive Tabu Search algorithm (MO-RTS) is proposed. The concepts of dominance are used to obtain Pareto's optimal frontier in the MO-RTS. The problem of placement of sectionalising switches (automatic or manual) to restore the distribution network and to reduce non-supplied energy costs when permanent faults occur in the network is solved simultaneously with the network expansion planning problem by means of a dedicated genetic algorithm. For testing, the proposed methodology is used as a primary power distribution system, with 180 points of consumption, where 49 already exist and 131 can be added to the system during the planning process.
Issue Date: 
1-Mar-2012
Citation: 
Iet Generation Transmission & Distribution. Hertford: Inst Engineering Technology-iet, v. 6, n. 3, p. 274-284, 2012.
Time Duration: 
274-284
Publisher: 
Inst Engineering Technology-iet
Source: 
http://dx.doi.org/10.1049/iet-gtd.2010.0666
URI: 
Access Rights: 
Acesso restrito
Type: 
outro
Source:
http://repositorio.unesp.br/handle/11449/9852
Appears in Collections:Artigos, TCCs, Teses e Dissertações da Unesp

There are no files associated with this item.
 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.