dc.contributor.authorVinasco, Guillermo-
dc.contributor.authorTejada, Diego-
dc.contributor.authorDa Silva, Emivan F.-
dc.contributor.authorRider, Marcos J.-
dc.date.accessioned2014-12-03T13:11:50Z-
dc.date.accessioned2016-10-25T20:15:19Z-
dc.date.available2014-12-03T13:11:50Z-
dc.date.available2016-10-25T20:15:19Z-
dc.date.issued2014-05-01-
dc.identifierhttp://dx.doi.org/10.1016/j.epsr.2013.12.016-
dc.identifier.citationElectric Power Systems Research. Lausanne: Elsevier Science Sa, v. 110, p. 94-103, 2014.-
dc.identifier.issn0378-7796-
dc.identifier.urihttp://hdl.handle.net/11449/113622-
dc.identifier.urihttp://acervodigital.unesp.br/handle/11449/113622-
dc.description.abstractThe hydroelectric power plant Hidroltuango represents a major expansion for the Colombian electrical system (with a total capacity of 2400 MW). This paper analyzes the possible interconnections and investments involved in connecting Hidroltuango, in order to strengthen the Colombian national transmission system. A Mixed Binary Linear Programming (MBLP) model was used to solve the Multistage Transmission Network Expansion Planning (MTEP) problem of the Colombian electrical system, taking the N-1 safety criterion into account. The N-1 safety criterion indicates that the transmission system must be expanded so that the system will continue to operate properly if an outage in a system element (within a pre-defined set of contingencies) occurs. The use of a MBLP model guaranteed the convergence with existing classical optimization methods and the optimal solution for the MTEP using commercial solvers. Multiple scenarios for generation and demand were used to consider uncertainties within these parameters. The model was implemented using the algebraic modeling language AMPL and solved using the commercial solver CPLEX. The proposed model was then applied to the Colombian electrical system using the planning horizon of 2018-2025. (C) 2014 Elsevier B.V. All rights reserved.en
dc.format.extent94-103-
dc.language.isoeng-
dc.publisherElsevier B.V.-
dc.sourceWeb of Science-
dc.subjectMultistage Transmission Networken
dc.subjectExpansion Planningen
dc.subjectN-1 safety criterionen
dc.subjectScenarios for generation and demanden
dc.subjectMixed Binary Linear Programmingen
dc.titleTransmission network expansion planning for the Colombian electrical system: Connecting the Ituango hydroelectric power planten
dc.typeoutro-
dc.contributor.institutionUniv Antioquia-
dc.contributor.institutionISA Interconex Elect SA-
dc.contributor.institutionUniversidade do Estado de Mato Grosso (UNEMAT)-
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)-
dc.description.affiliationUniv Antioquia, Fac Engn, Dept Elect Engn, GIMEL Grp, Medellin, Colombia-
dc.description.affiliationISA Interconex Elect SA, Medellin, Colombia-
dc.description.affiliationUNEMAT Univ Estado Mato Grosso, FACET Fac Ciencias Exatas & Tecnol, Sinop, MT, Brazil-
dc.description.affiliationUniv Estadual Paulista, UNESP, Dept Engn Eletr, Ilha Solteira, SP, Brazil-
dc.description.affiliationUnespUniv Estadual Paulista, UNESP, Dept Engn Eletr, Ilha Solteira, SP, Brazil-
dc.identifier.doi10.1016/j.epsr.2013.12.016-
dc.identifier.wosWOS:000335487700011-
dc.rights.accessRightsAcesso restrito-
dc.relation.ispartofElectric Power Systems Research-