Please use this identifier to cite or link to this item:
http://acervodigital.unesp.br/handle/11449/117643
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Khorasani, H. | - |
dc.contributor.author | Pourakbari-Kasmaei, M. | - |
dc.contributor.author | Romero, R. | - |
dc.contributor.author | IEEE | - |
dc.date.accessioned | 2015-03-18T15:56:37Z | - |
dc.date.accessioned | 2016-10-25T20:35:51Z | - |
dc.date.available | 2015-03-18T15:56:37Z | - |
dc.date.available | 2016-10-25T20:35:51Z | - |
dc.date.issued | 2013-01-01 | - |
dc.identifier | http://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=6712989 | - |
dc.identifier.citation | 2013 3rd International Conference On Electric Power And Energy Conversion Systems (epecs). New York: Ieee, 6 p., 2013. | - |
dc.identifier.issn | 2325-2677 | - |
dc.identifier.uri | http://hdl.handle.net/11449/117643 | - |
dc.identifier.uri | http://acervodigital.unesp.br/handle/11449/117643 | - |
dc.description.abstract | The transmission expansion planning problem in modern power systems is a large-scale, mixed-integer, nonlinear and non-convex problem. this paper presents a new mathematical model and a constructive heuristic algorithm (CHA) for solving transmission expansion planning problem under new environment of electricity restructuring. CHA finds an acceptable solution in an iterative process, where in each step a circuit is chosen using a sensitivity index and added to the system. The proposed model consider multiple generation scenarios therefore the methodology finds high quality solution in which it allows the power system operate adequacy in an environment with multiple generators scenarios. Case studies and simulation results using test systems show possibility of using Constructive heuristic algorithm in an open access system. | en |
dc.format.extent | 6 | - |
dc.language.iso | eng | - |
dc.publisher | Ieee | - |
dc.source | Web of Science | - |
dc.subject | Transmission expansion planning | en |
dc.subject | Constructive heuristic algorithm | en |
dc.subject | Open access | en |
dc.subject | Multiple generating scenarios | en |
dc.subject | hybrid model | en |
dc.title | Transmission Expansion Planning Via a Constructive Heuristic Algorithm in Restructured Electricity Industry | en |
dc.type | outro | - |
dc.contributor.institution | Universidade Estadual Paulista (UNESP) | - |
dc.description.affiliation | Univ Estadual Paulista, Dept Elect & Comp Engn, Ilha Solteira, SP, Brazil | - |
dc.description.affiliationUnesp | Univ Estadual Paulista, Dept Elect & Comp Engn, Ilha Solteira, SP, Brazil | - |
dc.identifier.wos | WOS:000345894400010 | - |
dc.rights.accessRights | Acesso restrito | - |
dc.relation.ispartof | 2013 3rd International Conference On Electric Power And Energy Conversion Systems (epecs) | - |
Appears in Collections: | Artigos, TCCs, Teses e Dissertações da Unesp |
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.