You are in the accessibility menu

Please use this identifier to cite or link to this item: http://acervodigital.unesp.br/handle/11449/31442
Full metadata record
DC FieldValueLanguage
dc.contributor.authorOliveira, ARL-
dc.contributor.authorSoares, S.-
dc.contributor.authorNepomuceno, L.-
dc.date.accessioned2014-05-20T15:20:05Z-
dc.date.accessioned2016-10-25T17:53:07Z-
dc.date.available2014-05-20T15:20:05Z-
dc.date.available2016-10-25T17:53:07Z-
dc.date.issued2005-02-01-
dc.identifierhttp://dx.doi.org/10.1016/j.ijepes.2004.07.009-
dc.identifier.citationInternational Journal of Electrical Power & Energy Systems. Oxford: Elsevier B.V., v. 27, n. 2, p. 91-99, 2005.-
dc.identifier.issn0142-0615-
dc.identifier.urihttp://hdl.handle.net/11449/31442-
dc.identifier.urihttp://acervodigital.unesp.br/handle/11449/31442-
dc.description.abstractIn this paper, short term hydroelectric scheduling is formulated as a network flow optimization model and solved by interior point methods. The primal-dual and predictor-corrector versions of such interior point methods are developed and the resulting matrix structure is explored. This structure leads to very fast iterations since it avoids computation and factorization of impedance matrices. For each time interval, the linear algebra reduces to the solution of two linear systems, either to the number of buses or to the number of independent loops. Either matrix is invariant and can be factored off-line. As a consequence of such matrix manipulations, a linear system which changes at each iteration has to be solved, although its size is reduced to the number of generating units and is not a function of time intervals. These methods were applied to IEEE and Brazilian power systems, and numerical results were obtained using a MATLAB implementation. Both interior point methods proved to be robust and achieved fast convergence for all instances tested. (C) 2004 Elsevier Ltd. All rights reserved.en
dc.format.extent91-99-
dc.language.isoeng-
dc.publisherElsevier B.V.-
dc.sourceWeb of Science-
dc.subjectshort term hydroelectric schedulingpt
dc.subjecthydroelectric systemspt
dc.subjectinterior point methodspt
dc.subjectnetwork flow modelpt
dc.titleShort term hydroelectric scheduling combining network flow and interior point approachesen
dc.typeoutro-
dc.contributor.institutionUniversidade Estadual de Campinas (UNICAMP)-
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)-
dc.description.affiliationUniv Estadual Campinas, Dept Math Appl, BR-13083970 Campinas, SP, Brazil-
dc.description.affiliationUniv Estadual Campinas, Sch Elect & Comp Engn, BR-13083970 Campinas, SP, Brazil-
dc.description.affiliationUNESP, Sch Engn, DEE, BR-17033360 Bauru, SP, Brazil-
dc.description.affiliationUnespUNESP, Sch Engn, DEE, BR-17033360 Bauru, SP, Brazil-
dc.identifier.doi10.1016/j.ijepes.2004.07.009-
dc.identifier.wosWOS:000226695800002-
dc.rights.accessRightsAcesso restrito-
dc.relation.ispartofInternational Journal of Electrical Power & Energy Systems-
Appears in Collections:Artigos, TCCs, Teses e Dissertações da Unesp

There are no files associated with this item.
 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.