You are in the accessibility menu

Please use this identifier to cite or link to this item: http://acervodigital.unesp.br/handle/11449/40634
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFerreira, Deisemara-
dc.contributor.authorMorabito, Reinaldo-
dc.contributor.authorRangel, Socorro-
dc.date.accessioned2014-05-20T15:31:31Z-
dc.date.accessioned2016-10-25T18:07:23Z-
dc.date.available2014-05-20T15:31:31Z-
dc.date.available2016-10-25T18:07:23Z-
dc.date.issued2009-07-16-
dc.identifierhttp://dx.doi.org/10.1016/j.ejor.2008.03.035-
dc.identifier.citationEuropean Journal of Operational Research. Amsterdam: Elsevier B.V., v. 196, n. 2, p. 697-706, 2009.-
dc.identifier.issn0377-2217-
dc.identifier.urihttp://hdl.handle.net/11449/40634-
dc.identifier.urihttp://acervodigital.unesp.br/handle/11449/40634-
dc.description.abstractIn this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company. (C) 2008 Elsevier B.V. All rights reserved.en
dc.description.sponsorshipFundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)-
dc.description.sponsorshipConselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)-
dc.format.extent697-706-
dc.language.isoeng-
dc.publisherElsevier B.V.-
dc.sourceWeb of Science-
dc.subjectLot sizingen
dc.subjectSchedulingen
dc.subjectSoft drink industryen
dc.subjectMixed integer programmingen
dc.subjectRelax-and-fix heuristicen
dc.titleSolution approaches for the soft drink integrated production lot sizing and scheduling problemen
dc.typeoutro-
dc.contributor.institutionUniversidade Federal de São Carlos (UFSCar)-
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)-
dc.description.affiliationUniversidade Federal de São Carlos (UFSCar), Dept Prod Engn, BR-13565905 São Carlos, SP, Brazil-
dc.description.affiliationSão Paulo State Univ, UNESP, BR-15054000 Sao Jose do Rio Preto, SP, Brazil-
dc.description.affiliationUnespSão Paulo State Univ, UNESP, BR-15054000 Sao Jose do Rio Preto, SP, Brazil-
dc.description.sponsorshipIdFAPESP: 04/00462-5-
dc.description.sponsorshipIdCNPq: 522973/95-4-
dc.description.sponsorshipIdCNPq: 473001/2004-7-
dc.identifier.doi10.1016/j.ejor.2008.03.035-
dc.identifier.wosWOS:000263206800032-
dc.rights.accessRightsAcesso restrito-
dc.relation.ispartofEuropean Journal of Operational Research-
Appears in Collections:Artigos, TCCs, Teses e Dissertações da Unesp

There are no files associated with this item.
 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.