You are in the accessibility menu

Please use this identifier to cite or link to this item: http://acervodigital.unesp.br/handle/11449/67981
Full metadata record
DC FieldValueLanguage
dc.contributor.authorNepomuceno, Leonardo-
dc.contributor.authorDa Silva, Paulo Sérgio-
dc.date.accessioned2014-05-27T11:21:12Z-
dc.date.accessioned2016-10-25T18:20:07Z-
dc.date.available2014-05-27T11:21:12Z-
dc.date.available2016-10-25T18:20:07Z-
dc.date.issued2004-12-01-
dc.identifierhttp://dx.doi.org/10.1109/TDC.2004.1432453-
dc.identifier.citation2004 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America, p. 633-638.-
dc.identifier.urihttp://hdl.handle.net/11449/67981-
dc.identifier.urihttp://acervodigital.unesp.br/handle/11449/67981-
dc.description.abstractThe Predispatch model (PD) calculates a short-term generation policy for power systems. In this work a PD model is proposed that improves two modeling aspects generally neglected in the literature: voltage/reactive power constraints and ramp rate constraints for generating units. Reactive power constraints turn the PD into a non-linear problem and the ramp rate constraints couple the problem dynamically in time domain. The solution of the PD is turned into a harder task when such constraints are introduced. The dual decomposition/ lagrangian relaxation technique is used in the solution approach for handing dynamic constraints. As a result the PD is decomposed into a series of independent Optimal Power Flow (FPO) sub problems, in which the reactive power is represented in detail. The solution of the independent FPO is coordinated by means of Lagrange multipliers, so that dynamic constraints are iteratively satisfied. Comparisons between dispatch policies calculated with and without the representation of ramp rate constraints are performed, using the IEEE 30 bus test system. The results point-out the importance of representing such constraints in the generation dispatch policy. © 2004 IEEE.en
dc.format.extent633-638-
dc.language.isoeng-
dc.sourceScopus-
dc.subjectDual decomposition/lagrangian relaxation-
dc.subjectHydrothermal power systems-
dc.subjectPower generation dispatch-
dc.subjectRamp rate constraints-
dc.subjectCapacitors-
dc.subjectCosts-
dc.subjectDecomposition-
dc.subjectElectric potential-
dc.subjectElectric transformers-
dc.subjectReactive power-
dc.subjectElectric power generation-
dc.titleAn active/reactive predispatch model incorporating ramp rate constraints solved by dual decomposition/lagrangian relaxationen
dc.typeoutro-
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)-
dc.description.affiliationElectrical Engineering Department São Paulo State University UNESP, Bauru-SP, 17033-360-
dc.description.affiliationUnespElectrical Engineering Department São Paulo State University UNESP, Bauru-SP, 17033-360-
dc.identifier.doi10.1109/TDC.2004.1432453-
dc.identifier.wosWOS:000228358400112-
dc.rights.accessRightsAcesso restrito-
dc.relation.ispartof2004 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America-
dc.identifier.scopus2-s2.0-22744447441-
Appears in Collections:Artigos, TCCs, Teses e Dissertações da Unesp

There are no files associated with this item.
 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.