You are in the accessibility menu

Please use this identifier to cite or link to this item: http://acervodigital.unesp.br/handle/11449/68455
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSousa, T.-
dc.contributor.authorJardini, J. A.-
dc.contributor.authorMasuda, M.-
dc.contributor.authorDe Lima, R. A.-
dc.date.accessioned2014-05-27T11:21:39Z-
dc.date.accessioned2016-10-25T18:21:14Z-
dc.date.available2014-05-27T11:21:39Z-
dc.date.available2016-10-25T18:21:14Z-
dc.date.issued2005-10-31-
dc.identifierhttp://dx.doi.org/10.1109/PES.2005.1489193-
dc.identifier.citation2005 IEEE Power Engineering Society General Meeting, v. 2, p. 2064-2069.-
dc.identifier.urihttp://hdl.handle.net/11449/68455-
dc.identifier.urihttp://acervodigital.unesp.br/handle/11449/68455-
dc.description.abstractStarting from the deregulated process of the Electric Sector, there was the need to attribute responsibilities to several agents and to elaborate appropriate forms of remuneration of the services rendered by the same. One of the services of great importance within this new electric sector is the Ancillary Services. Among the various types of Ancillary Services, Spinning Reserve is a service necessary for maintaining the integrity of the transmission system from either generation interruptions or load variations. This paper uses the application of the Economic Dispatch theory with the objective of quantifies the availability of Spinning Reserve supply in hydroelectric plants. The proposed methodology utilizes the generating units as well as their efficiencies so as to attend the total demand with the minimum water discharge. The proposed methodology was tested through the data provided by the Água Vermelha Hydroelectric Power Plant. These tests permitted the opportunity cost valuation to the Spinning Reserve supply in hydroelectric plants. © 2005 IEEE.en
dc.format.extent2064-2069-
dc.language.isoeng-
dc.sourceScopus-
dc.subjectAncillary Services-
dc.subjectHydraulic Generation-
dc.subjectOpportunity Cost-
dc.subjectSpinning Reserve-
dc.subjectAncillary services-
dc.subjectHydraulic generation-
dc.subjectOpportunity cost-
dc.subjectSpinning reserve-
dc.subjectData reduction-
dc.subjectElectric power transmission-
dc.subjectElectric utilities-
dc.subjectHydroelectric power plants-
dc.subjectIndustrial economics-
dc.subjectCost accounting-
dc.titleSpinning reserve opportunity cost in hydroelectric plantsen
dc.typeoutro-
dc.contributor.institutionIEEE-
dc.contributor.institutionUniversidade de São Paulo (USP)-
dc.contributor.institutionAES Tietê S. A-
dc.contributor.institutionCIGRE-
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)-
dc.contributor.institutionAES Tietê S.A-
dc.description.affiliationIEEE-
dc.description.affiliationDepartment of Electrical Engineering Sao Paulo University, Sao Paulo-
dc.description.affiliationAES Tietê S. A, Sao Paulo-
dc.description.affiliationGAGTD Polytechnic School University of Sao Paulo-
dc.description.affiliationDepartment of Electrical Engineering of the Latter Institution-
dc.description.affiliationDepartment of Engineering of Energy and Electric Automation USP-
dc.description.affiliationCIGRE-
dc.description.affiliationIAS IEEE-
dc.description.affiliationState University of Sao Paulo (UNESP)-
dc.description.affiliationAES Tietê S.A-
dc.description.affiliationUnespState University of Sao Paulo (UNESP)-
dc.identifier.doi10.1109/PES.2005.1489193-
dc.rights.accessRightsAcesso restrito-
dc.relation.ispartof2005 IEEE Power Engineering Society General Meeting-
dc.identifier.scopus2-s2.0-27144527322-
Appears in Collections:Artigos, TCCs, Teses e Dissertações da Unesp

There are no files associated with this item.
 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.