Utilize este identificador para citar ou criar um link para este item:
http://acervodigital.unesp.br/handle/11449/9375
- Título:
- Interior point method for long-term generation scheduling of large-scale hydrothermal systems
- Universidade Estadual Paulista (UNESP)
- Universidade Estadual de Campinas (UNICAMP)
- 0254-5330
- This paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem.
- 1-Jul-2009
- Annals of Operations Research. Dordrecht: Springer, v. 169, n. 1, p. 55-80, 2009.
- 55-80
- Springer
- Hydrothermal generation scheduling
- Long-term operational planning
- Nonlinear optimization
- Interior point method
- http://dx.doi.org/10.1007/s10479-008-0389-z
- Acesso restrito
- outro
- http://repositorio.unesp.br/handle/11449/9375
Não há nenhum arquivo associado com este item.
Itens do Acervo digital da UNESP são protegidos por direitos autorais reservados a menos que seja expresso o contrário.