Utilize este identificador para citar ou criar um link para este item:
http://acervodigital.unesp.br/handle/11449/9375
Registro de metadados completo
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.author | Azevedo, Anibal Tavares | - |
dc.contributor.author | Leite Oliveira, Aurelio Ribeiro | - |
dc.contributor.author | Soares, Secundino | - |
dc.date.accessioned | 2014-05-20T13:28:14Z | - |
dc.date.accessioned | 2016-10-25T16:47:59Z | - |
dc.date.available | 2014-05-20T13:28:14Z | - |
dc.date.available | 2016-10-25T16:47:59Z | - |
dc.date.issued | 2009-07-01 | - |
dc.identifier | http://dx.doi.org/10.1007/s10479-008-0389-z | - |
dc.identifier.citation | Annals of Operations Research. Dordrecht: Springer, v. 169, n. 1, p. 55-80, 2009. | - |
dc.identifier.issn | 0254-5330 | - |
dc.identifier.uri | http://hdl.handle.net/11449/9375 | - |
dc.identifier.uri | http://acervodigital.unesp.br/handle/11449/9375 | - |
dc.description.abstract | This paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem. | en |
dc.format.extent | 55-80 | - |
dc.language.iso | eng | - |
dc.publisher | Springer | - |
dc.source | Web of Science | - |
dc.subject | Hydrothermal generation scheduling | en |
dc.subject | Long-term operational planning | en |
dc.subject | Nonlinear optimization | en |
dc.subject | Interior point method | en |
dc.title | Interior point method for long-term generation scheduling of large-scale hydrothermal systems | en |
dc.type | outro | - |
dc.contributor.institution | Universidade Estadual Paulista (UNESP) | - |
dc.contributor.institution | Universidade Estadual de Campinas (UNICAMP) | - |
dc.description.affiliation | Univ Estadual Paulista, Dept Math, BR-12516410 Guaratingueta, SP, Brazil | - |
dc.description.affiliation | Univ Estadual Campinas, Dept Appl Math, BR-13083970 Campinas, SP, Brazil | - |
dc.description.affiliation | Univ Estadual Campinas, Sch Elect & Comp Engn, BR-13083852 Campinas, SP, Brazil | - |
dc.description.affiliationUnesp | Univ Estadual Paulista, Dept Math, BR-12516410 Guaratingueta, SP, Brazil | - |
dc.identifier.doi | 10.1007/s10479-008-0389-z | - |
dc.identifier.wos | WOS:000264880000005 | - |
dc.rights.accessRights | Acesso restrito | - |
dc.relation.ispartof | Annals of Operations Research | - |
Aparece nas coleções: | Artigos, TCCs, Teses e Dissertações da Unesp |
Não há nenhum arquivo associado com este item.
Itens do Acervo digital da UNESP são protegidos por direitos autorais reservados a menos que seja expresso o contrário.