Você está no menu de acessibilidade

Utilize este identificador para citar ou criar um link para este item: http://acervodigital.unesp.br/handle/11449/9816
Registro de metadados completo
Campo DCValorIdioma
dc.contributor.authorPourakbari-Kasmaei, M.-
dc.contributor.authorRashidi-Nejad, M.-
dc.date.accessioned2014-05-20T13:29:11Z-
dc.date.accessioned2016-10-25T16:48:37Z-
dc.date.available2014-05-20T13:29:11Z-
dc.date.available2016-10-25T16:48:37Z-
dc.date.issued2011-08-01-
dc.identifierhttp://dx.doi.org/10.1016/j.enconman.2011.02.018-
dc.identifier.citationEnergy Conversion and Management. Oxford: Pergamon-Elsevier B.V. Ltd, v. 52, n. 8-9, p. 2854-2860, 2011.-
dc.identifier.issn0196-8904-
dc.identifier.urihttp://hdl.handle.net/11449/9816-
dc.identifier.urihttp://acervodigital.unesp.br/handle/11449/9816-
dc.description.abstractThis paper proposes a new approach and coding scheme for solving economic dispatch problems (ED) in power systems through an effortless hybrid method (EHM). This novel coding scheme can effectively prevent futile searching and also prevents obtaining infeasible solutions through the application of stochastic search methods, consequently dramatically improves search efficiency and solution quality. The dominant constraint of an economic dispatch problem is power balance. The operational constraints, such as generation limitations, ramp rate limits, prohibited operating zones (POZ), network loss are considered for practical operation. Firstly, in the EHM procedure, the output of generator is obtained with a lambda iteration method and without considering POZ and later in a genetic based algorithm this constraint is satisfied. To demonstrate its efficiency, feasibility and fastness, the EHM algorithm was applied to solve constrained ED problems of power systems with 6 and 15 units. The simulation results obtained from the EHM were compared to those achieved from previous literature in terms of solution quality and computational efficiency. Results reveal that the superiority of this method in both aspects of financial and CPU time. (C) 2011 Elsevier Ltd. All rights reserved.en
dc.format.extent2854-2860-
dc.language.isoeng-
dc.publisherPergamon-Elsevier B.V. Ltd-
dc.sourceWeb of Science-
dc.subjectEconomic dispatchen
dc.subjectProhibited operating zonesen
dc.subjectRamp rate limitsen
dc.subjectNetwork lossen
dc.titleAn effortless hybrid method to solve economic load dispatch problem in power systemsen
dc.typeoutro-
dc.contributor.institutionUniversidade Estadual Paulista (UNESP)-
dc.contributor.institutionShahid Bahonar Univ Kerman-
dc.description.affiliationUNESP Univ Estadual Paulista, Fac Ingn Ilha Solteira, Dept Engn Eletr, BR-15385000 Ilha Solteira, SP, Brazil-
dc.description.affiliationShahid Bahonar Univ Kerman, Dept Elect Engn, Kerman, Iran-
dc.description.affiliationUnespUNESP Univ Estadual Paulista, Fac Ingn Ilha Solteira, Dept Engn Eletr, BR-15385000 Ilha Solteira, SP, Brazil-
dc.identifier.doi10.1016/j.enconman.2011.02.018-
dc.identifier.wosWOS:000292181200009-
dc.rights.accessRightsAcesso restrito-
dc.relation.ispartofEnergy Conversion and Management-
Aparece nas coleções:Artigos, TCCs, Teses e Dissertações da Unesp

Não há nenhum arquivo associado com este item.
 

Itens do Acervo digital da UNESP são protegidos por direitos autorais reservados a menos que seja expresso o contrário.